设为首页 设为收藏 旧版网站

联系方式

 

销售经理: 150 3855 4363   130 1558 3380

24小时技术支持热线:15038554363

电话:0379-69766926

传真:0379-69766926

公司地址:洛阳自贸区高新区银昆科技园

生产厂址:洛新工业园

  • 产品
  • 钢壳IGBT中频熔炼炉

    棒料加热炉

    0.25T并联中频炉

    0.5T中频炉

    0.5T并联中频炉

    0.5T串联中频炉

    0.5T 中频熔炉

    0.25T中频熔炉

    1T中频熔炉

    2T中频熔炉

    5T中频熔炉

    中频熔炉

    中频感应炉

    250kg中频感应炉

    500kg中频感应炉

    1T中频感应炉

    2T中频感应炉

    5T中频感应炉

    3T中频感应炉

    全自动中频感应加热炉

    圆钢中频感应加热炉

    中频钨钼烧结炉

    中频感应烧结炉

    钼丝钼块烧结炉

    钢管加热炉

    圆钢感应加热炉

    350kW铝圆棒中频感应自动加热生产线

    Φ65mm圆钢中频锻造炉

    技术文章
    分享到:
        本文为技术资料或者文章来自网络,仅供参考学习,如涉嫌侵权,请告知删除
        

    一、项目内容:

       Ф108—Ф630钢管3PE防腐生产线

    二、设计依据:

    钢管直径:Ф108—Ф630

    钢管长度:8000-12000

    工艺速度:1200/min4000/min

    三、管道传送架

    根据用户要求,我公司Ф108—Ф630 钢管3PE管道防腐 管道防腐生产线设计为传动轴连接的传送线,这样使管道运行速度平稳并方便了大小管螺距的调整。传送架底座采用国标18#槽钢、18#方钢和 12㎜厚钢板焊接。此生产线传送架的规格为1600㎜×5000㎜×12个(每个架装三组轮胎)。1600㎜×800㎜×5个,(其中一个装高温轮,一个加装动力)。传送轮型号为600-9充气轮胎(比实心轮变形能力强,管道运行平稳),动力采用变频控制。传动轮底座固定在孔间距一致的调节轨道上,方便大小管间距的调节;宽度调节采用丝杠调节,提高了管道传送精度减少了劳动强度。               

    四、除锈机:

    本机是在引进美国、意大利的先进技术的基础上,采用现代计算机模拟技术,研制开发的一种新型钢管外壁抛丸清理设备,可去除钢管表面的锈和氧化皮,完全达到钢管外壁涂履前的清理要求,可满足小、中型工程钢管外壁清理需要。它具有以下优点:

    1、采用大抛丸量、高抛射速度的国际上第五代悬臂离心式抛丸器,显著地提高了清理效率,获得满意的清理质量,属专利产品。

    2、该设备是根据国内外先进技术重新设计而研制成功的,具有生产率高、操作方便、体积小的特点,属国内首创。

    五、中频加热:

    此生产线配置250KW500KW共二台中频加热设备。250KW用于除锈机前,除去钢管表面水分,提高除锈效果。500KW用于外环氧粉末喷涂加热。

    250kw参数:

    名    称

    参  数

    名   称

    参    数

    输入电压

    380V

    输出最高电压

    780V

    输入电流

    400A

    输出最大电流

    500A

    输入频率

    50HZ

    输 出 频 率

    500HZ800HZ

    500kw参数:

    名    称

    参  数

    名   称

    参    数

    输入电压

    380V

    输出最高电压

    780V

    输入电流

    850A

    输出最大电流

    1000A

    输入频率

    50HZ

    输 出 频 率

    500HZ800HZ

     

    六、喷粉系统:

    18枪控制中心。       DK型        1套                                

    以上装置含自动喷枪8支,喷枪为内置高压,控制柜控制8支自动喷枪的电压、电流及气路系统。并控制8支文丘里供粉泵供粉系统。

    以上装置含流化床供粉系统1,流化床外形尺寸:(L×W×H)800×775×570(mm)8支文丘里供粉泵。

    七、挤塑机

    此生产线须配置SJF150/30一台、SJF65/28一台防腐专用挤出机。

    八、水冷却室:

      采用塑钢封闭,美观大方,便于观察。全部做成活动窗,方便进入。水泵采用流量为每小时100立方二台(一台备用)。冷却水管调节阀门装在操作柜一侧,便于调节。

    九、 空压机及拨管机构:

    本生产线配备一台6立方螺杆式空压机,一台6立方空气干燥机,1立方储气罐一台供喷粉设备用,但气量有富余,所以把拨管系统的油缸改为气缸,节省了液压站及液压油的投资和每年换液压油的费用。维修也干净、方便。共需要8个拨叉及气缸,2个举升机气缸。

    十、 破口机、举升机和二次除锈机:

      破口机采用钢丝轮破口机,本套装置安装行走轮可移动工作。而且装有粉尘回收装置有效解决环保问题。

       举升机采用气缸升降,传动轮采用单轮举升两端动力传动的方式,保证加工需要。  

       二次除锈采用钢丝轮除锈及压缩空气吹扫,保证钢管外壁清洁度达到要求,提高环氧粉末的附着力。

    十一、放管平台

        上管、下管、过渡平台均采用18#国标工字钢焊接,保证了平台的坚固性。三个平台总长30米。

    十二、制造及安装工期

      制作工期为合同生效之日起40天制作完毕,安装工期20天(安装条件具备)。  

     

    Ф108 —Ф630 steel pipe 3 PE anti-corrosion production line

     

    1, the project content:

    Ф108 —Ф630 steel pipe 3- layer PE anti-corrosion production line

    2, the design basis:

    Steel pipe diameter: Ф108 —Ф63 0

    Steel pipe length: 8000 mm -12000 mm

    Process speed: 1200 mm / min - 4000 mm / min

    3, the pipeline conveyor

    According to user requirements, our company Ф 108 —Ф 63 0 The steel pipe 3 PE pipeline anti-corrosion , the pipeline anti-corrosion production line is designed as the transmission line connecting the drive shaft , so that the pipeline running speed is stable and the adjustment of the pitch of the large and small pipes is facilitated. The base of the conveyor is welded with GB 18 # channel steel, 18 # square steel and 12 mm thick steel plate. The specification of this line conveyor is 1600 mm × 5000 mm × 12 (three sets of tires per rack). 1600 mm × 800 mm × 5 (one of them is equipped with a high temperature wheel and one is equipped with power). The transmission wheel model is a 600-9 pneumatic tire (stronger than the solid wheel, the pipeline runs smoothly), and the power is controlled by frequency conversion. The base of the transmission wheel is fixed on the adjusting track with the same hole spacing to facilitate the adjustment of the spacing between the large and small pipes; the width adjustment adopts the screw adjustment, which improves the pipeline conveying precision and reduces the labor intensity.

    4, the descaling machine:

    This machine is based on the introduction of advanced technology from the United States and Italy, using a modern computer simulation technology, developed a new type of steel pipe outer wall shot blasting equipment, which can remove the rust and scale on the surface of the steel pipe, completely before the outer wall of the steel pipe is painted. The cleaning requirements can meet the needs of cleaning the outer wall of small and medium-sized engineering steel pipes. It has the following advantages:

    1. The fifth-generation cantilever centrifugal blasting machine with large shot blasting and high throwing speed has significantly improved the cleaning efficiency and obtained satisfactory cleaning quality. It is a patented product.

    2. The equipment has been successfully developed according to the redesign of advanced technology at home and abroad. It has the characteristics of high productivity, convenient operation and small volume, and is the first in China.

    5, medium frequency heating:

    This production line is equipped with 2 50KW and 50 0KW total two intermediate frequency heating equipment. 25 0KW is used for removing the surface moisture of the steel pipe before the descaling machine to improve the descaling effect. 5 00 KW is used for external epoxy powder spray heating.

    25 0kw parameters:

    Name

    Parameter

    Name

    Parameter

    Input voltage

    380V

    Output maximum voltage

    780V

    Input Current

    40 0A

    Output maximum current

    5 00A

    Input frequency

    50HZ

    Output frequency

    500HZ ~ 800HZ

    500kw parameters:

    Name

    Parameter

    Name

    Parameter

    Input voltage

    380V

    Output maximum voltage

    780V

    Input Current

    850A

    Output maximum current

    1000A

    Input frequency

    50HZ

    Output frequency

    500HZ ~ 800HZ

    6, dusting system:

     8 gun control center. DK type 1 set

    The above device contains 8 automatic spray guns , the spray gun is built-in high pressure, and the control cabinet controls the voltage, current and pneumatic system of 8 automatic spray guns. And control 8 venturi powder pump powder supply system.

    The above device contains one set of fluidized bed powder supply system . The size of the fluidized bed : (L × W × H) 800 × 775 × 570 (mm) contains 8 venturi powder pumps.

    7, extrusion machine

    This production line shall be equipped withone SJF1 5 0/30, one SJF 6 5/ 28 anti-corrosion special extruder.

    8, water cooling room:

    It is closed with plastic steel and is beautiful and easy to observe. All are made into a movable window for easy access. The pump uses a flow rate of 100 cubic meters per hour (one standby). The cooling water pipe regulating valve is installed on the side of the operation cabinet for easy adjustment.

    9, air compressor and pipe mechanism:

    The production line is equipped with a 6- cubic screw air compressor, a 6- cubic air dryer, and a 1- cube gas storage tank for the powder spraying equipment. However, the gas volume is sufficient, so the cylinder of the pipe-drawing system is changed to a cylinder. It saves the investment in hydraulic stations and hydraulic oil and the cost of changing hydraulic oil every year. Maintenance is also clean and convenient. A total of 8 forks and cylinders and 2 lift cylinders are required.

    10, breaking machine, lift and secondary descaling machine:

    The breaking machine adopts a wire wheel breaking machine, and the set device is equipped with a walking wheel to be movable. Moreover, the dust recovery device is equipped to effectively solve environmental problems.

    The lift adopts the cylinder lifting, and the transmission wheel adopts the single- wheel lifting power transmission at both ends to ensure the processing needs.  

    The secondary descaling adopts the wire wheel derusting and compressed air purging to ensure the cleanliness of the outer wall of the steel pipe meets the requirements and improve the adhesion of the epoxy powder.

    11, the release platform

    The upper tube, the lower tube and the transition platform are all welded with 18# GB-shaped I-beam, which ensures the robustness of the platform. The three platforms have a total length of 30 meters.

    12, manufacturing and installation schedule

    The production period is 40 days from the effective date of the contract , and the installation period is 20 days (the installation conditions are available).

    http://www.firstfurnace.com/BdwlkjProduct.asp?id=396


    Copyright© 2007-2013透热炉城 All Rights Reserved 
    电 话:0379—69766926 手 机:13015583380